The BPMN Toolbar contains multiple shapes that can be linked to one another in the Diagram Frame. Arrange these shapes in the method most reflective of your flow of work and link them together using the same methods as you would when linking Sub-Processes.

Need more help with this?
Visit the Support Portal

Thanks for your feedback.